{"id":1695,"date":"2026-01-06T23:24:49","date_gmt":"2026-01-06T23:24:49","guid":{"rendered":"https:\/\/energy-technik.com\/?page_id=1695"},"modified":"2026-01-16T22:37:48","modified_gmt":"2026-01-16T22:37:48","slug":"energy-generation","status":"publish","type":"page","link":"https:\/\/energy-technik.com\/en\/energy-generation\/","title":{"rendered":"Energy Generation Projects"},"content":{"rendered":"\n\n\n<h1>Energy Generation Projects<\/h1>\n\n\n\n\n\n\n<h2>Grid-tied Solar PV Plant Consulting<\/h2>\n\n<h3>September 2025, Agricultural farm, Abu Ghaleb, Alexandria-Cairo road, Egypt<\/h3>\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n<p style=\"font-family:Montserrat ; font-size: 18px; font-weight: 400; color: black; \"> <b>Consulting Activities<\/b><\/p>\n\n<h2><ol start=\"1\" type=\"1\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none; color: black\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black\">Component specification<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n<h2><ol start=\"2\" type=\"2\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none; color: black\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black\">Technical documents<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n\nSingle line diagram (SLD)\n\n\nString wiring\n\n\nPlant layout\n\n\n\n<h2><ol start=\"3\" type=\"3\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none; color: black\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black\">Financial assessment<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n<h2><ol start=\"4\" type=\"4\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none; color: black\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black\">Contract review<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n<h2><ol start=\"5\" type=\"5\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none; color: black\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black\">Supervision of installation<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n\nCivil installation\n\n\nMechanical installation\n\n\nElectrical installation\n\n\n\n<h2><ol start=\"6\" type=\"6\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none; color: black\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black\">Documentation review<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n<h2><ol start=\"7\" type=\"7\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none; color: black\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black\">Energization &amp; final acceptance<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n\n\n\n\n\n\n<h2>Solar PV Plant Operation &amp; Maintenance (O&amp;M)<\/h2>\n\n<h3>2024, industrial, switchgear factory6th of October, Egypt<\/h3>\n\n\n\n\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: justify;\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;Operation &amp; Maintenance of 1 MWp PV plant, Feed-In-Tariff (FIT) O&amp;M values included<\/p>\n\n<h2><ol start=\"1\" type=\"1\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none;\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400\">Vendor qualification<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n<h2><ol start=\"2\" type=\"2\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none;\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400\">Maintenance schedule preparation follow-up<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n<h2><ol start=\"3\" type=\"3\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none;\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400\">Troubleshooting ticket issuing<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n<h2><ol start=\"4\" type=\"4\" style=\"margin-left: 0.2in; font-family: Montserrat; font-size: 20px; font-weight: lighter; text-transform: none;\"><span style=\"line-height: 1.5; font-size: medium;\"><li class=\"MsoNormal\"><h5 style=\"font-family: Montserrat; font-size: 18px; font-weight: 400\">Preventative corrective maintenance of transformers, central inverter units, string inverters PV modules.<\/h5><\/li><\/span><\/ol><\/h2>\n\n\n\n\n\n\n\n\n\n\n\n<h2>Off-grid Solar PV System<\/h2>\n\n\n<h3>September 2022, Residential, Ain El-Sokhna, Suez, Egypt<\/h3>\n\n\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: justify;\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Supply of a 2.22 kWp hybrid solar PV system with 9.6 kWh batteries &amp; a grid connection to charge the batteries.<\/p>\n\n\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n\n\n\n\n\n<h2>Installation of a Grid-tied Solar PV Power Plant<\/h2>\n\n\n<h3>April 2022, Residential, Soma Bay, Red sea, Egypt<\/h3>\n\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: justify;\">&nbsp; Installation of a 26 kWp solar PV power plant for a residence located directly on the coast of the red sea taking into consideration the harsh nature of the climate in this area.<\/p>\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n\n\n\n\n<h2>Grid-tied Solar PV Power Plant<\/h2>\n\n\n<h3>June 2021, Industrial, Dairy factory, Fayoum, Egypt<\/h3>\n\n\n\n\n\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: justify;\">&nbsp; &nbsp; &nbsp; &nbsp;An EPC contract for the installation of a 100 kWp grid-tied PV plant with an automatic cleaning system for reducing the precipitation of dust on the panels. The PV power plant was built to <strong> save rising electrical bill costs <\/strong> for the plant.<\/p>\n\n\n\n\n\n\n\n\n\n\n\n<h2>Off-grid Solar PV System<\/h2>\n\n\n<h3>May 2021, Commercial, El-Dakhla Oasis, Egypt <\/h3>\n\n\n\n\n<p style=\"font-family:Montserrat ; font-size: 18px; font-weight: 400; color: black; \">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Supply of a 4 kWp hybrid solar PV system with 9.6 kWh batteries &amp; a grid connection to charge the batteries.<\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n<h2>Smart Grid-tied Solar PV Power Plant<\/h2>\n\n\n<h3>June 2020, Research &amp; Development, American University in Cairo (AUC), 5th Settlement, Egypt <\/h3>\n\n\n\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: justify;\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; An EPC contract for the installation of a 27.6 kWp grid-tied PV plant with remote monitoring features &amp; smart applications. The plant was constructed mainly to perform R&amp;D activities to make the solar PV plant more autonomous by acquiring the data from the field, send it to a server over an IoT network connected to a Wide Area Network (WAN) &amp; run artificial intelligence algorithms to predict performance &amp; reduce downtime. Solar characterizes were developed &amp; installed to measure the IV characteristics of the installed panels to <b> locate faulty panels <\/b>easily &amp; <b> reduce downtime. <\/b> <\/p>\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: justify;\">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;A weather station was installed &amp; connected to the IoT network to measure wind speed, solar radiation, humidity, precipitation &amp; air pressure to define patterns in the data model that will be used by the plant to perform autonomous decision enhancing <b> grid stability <\/b>. The IoT &amp; WAN are designed with <b> cyber-security features <\/b>including wireless security &amp; hardware security. The plant can be <b> remotely controlled <\/b> to facilitate the operator&#8217;s job as he will not need to be in the field to measure, monitor or control. The plant includes a <b> smart safety feature <\/b>that prevents remote operation while local operation is in progress. The operator can <b> shutdown multiple devices with a single command <\/b> or <b> isolate any device <\/b> at will. 16Off-grid Solar PV System<\/p>\n\n\n\n\n\n\n\n<h2>Solar Pumping System<\/h2>\n\n\n<h3>May 2020, agricultural farm, Alexandria-Cairo road, Egypt <\/h3>\n\n\n\n\n<p style=\"font-family:Montserrat ; font-size: 18px; font-weight: 400; color: black; \">&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;An off-grid 46.5 kWp solar photovoltaic power plant was installed for solar pumping. The pant was built to produce an average of 350 m3 of water per day. The EPC contract was developed on a turnkey basis to supply &amp; install the PV plant, the submersible cable &amp; the submersible motor.<\/p>\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n\n\n\n\n\n\n<h2>Grid-tied Solar PV Power Plant<\/h2>\n\n\n<h3>January 2020, Government, Fayoum, Egypt <\/h3>\n\n\n\n\n\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: center;\">A 20.0 kWp on-grid solar PV plant was built on an EPC contract model basis for the installation of a grid-tied PV plant to <b> save rising electrical bill costs <\/b> for the building.<br><\/p>\n\n\n\n\n\n\n\n<h2>Solar Pumping System<\/h2>\n\n\n<h3>May 2019, agricultural farm, Alexandria-Cairo road,Egypt <\/h3>\n\n\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: center;\">An off-grid 60 kWp solar photovoltaic power plant was installed for solar pumping. The pant was built to produce an average of 350 m3 of water per day. The EPC contract was developed on a turnkey basis to supply &amp; install the PV plant and a manual transfer switch to alternate operation between the 60 hp submersible pump &amp; the 40 hp booster pump. <\/p>\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n\n\n\n\n\n\n<h2>Corrective Maintenance of PVS980 Central Inverters<\/h2>\n\n<h3>April 2019, Goldmine, Essakane, Burkina Faso<\/h3>\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: center;\">A successful repair of some of the state-of-the-art technologies at the time. Expert Level Certification for PVS980 maintenance &amp; Commissioning from ABB Helsinki Corrective maintenance of (x6) PVS980 central inverters 12 MWp hybrid solar PV plant <\/p>\n\n\n\n\n\n\n\n<h2>Grid-tied Solar PV Power Plant<\/h2>\n\n\n<h3>November 2018, Commercial, gas station, Kom Oshim, Fayoum, Egypt <\/h3>\n\n\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n<p style=\"font-family: Montserrat; font-size: 18px; font-weight: 400; color: black; text-align: center;\">A 27.6 kWp on-grid solar PV plant was built on an EPC contract model basis for the installation of a grid-tied PV plant to <b> save rising electrical bill costs <\/b>for the building.<br><\/p>\n\n\n\n<p>Lorem Ipsum has been the industry&#8217;s standard dummy text ever since the 1500s.<\/p>\n\n\n\n\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-1695","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/pages\/1695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/comments?post=1695"}],"version-history":[{"count":37,"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/pages\/1695\/revisions"}],"predecessor-version":[{"id":1993,"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/pages\/1695\/revisions\/1993"}],"wp:attachment":[{"href":"https:\/\/energy-technik.com\/en\/wp-json\/wp\/v2\/media?parent=1695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}