Automation and Digital Systems
Energy Metering Solution
March 2025, Water Production Plant, Kingdom of Saudi Arabia
Engineering, supervision of installation, testing & commissioning of (x40) energy meters in medium-voltage & high-voltage power plants.
Activities include:
Design & engineering.
Design & engineering.
Supervision of installation.
Supervision of installation.
Testing & commissioning.
Testing & commissioning.
Programming & configuration.
Programming & configuration.
Water Desalination Plant, Kingdom of Saudi Arabia.
Water Desalination Plant, Kingdom of Saudi Arabia.
Digital Ring-Main Unit Solution
2024, industrial, switchgear factory, 6th of October, Egypt
Development of a digital solution to monitor & control a ring-main unit containing Ulosuy/EATON gas-insulated load-break switches using ABB 530 Remote terminal unit (RTU).
The RTU system enables the customer to compete in the market and comply with the new digital ring-main unit specifications.
Furthermore, the solution developed is IEC61850, Modbus TCP & RTU compliant.
Digital Primary MV AIS Solution
2024, industrial, switchgear factory, 6th of October, Egypt
Development of a the primary medium-voltage air insulated switchgear smart solution for PIX24 using Saitel DR Remote terminal unit (RTU).
The PIX24 cubicle can be fully controlled & monitored remotely through the circuits installed & software program developed.
The RTU system enables the customer to compete in the market and comply with the new digital switchgear specifications.
Furthermore, the solution developed is IEC61850, Modbus TCP & RTU compliant.
Pumping System
Automation
January 2022, commercial, hotels & resorts, 6th of October, Egypt
Supply of a softstarter with an automatic control system that controls the starting procedure, number of starts & time delay before allowing a consecutive pump start.
The pump is powered by an asynchronous 40 hp motor.
Activities include: