Energy Metering Solution

March 2025, Water Production Plant, Kingdom of Saudi Arabia

Engineering, supervision of installation, testing & commissioning of (x40) energy meters in medium-voltage & high-voltage power plants.

Activities include:

  1. Design & engineering.


  1. Supervision of installation.


  1. Testing & commissioning.

  • Loop check tests using secondary injection.
  • Phase check tests.
  • Insulation resistance tests.
  • Functional tests.

  1. Programming & configuration.


  1. Water Desalination Plant, Kingdom of Saudi Arabia.

24-01
24-02

Emergency Diesel Generator
الأتمتة

2025, Electrical Generation Power Plant, Kingdom of Saudi Arabia

23-01
23-03
23-02

Commissioning of a medium-voltage emergency diesel generator control system.

Testing & commissioning activities cover:

  • Diesel engine control & synchronization system.
  • Remote monitoring & control of PLC.
  • Diesel engine AVR excitation system.
  • Diesel engine generator protection system.
  • DC battery charger system.
  • Sealed lead acid battery system.

Digital Ring-Main Unit Solution

2024, industrial, switchgear factory, 6th of October, Egypt

21-01
21-02

Development of a digital solution to monitor & control a ring-main unit containing Ulosuy/EATON gas-insulated load-break switches using ABB 530 Remote terminal unit (RTU).

The RTU system enables the customer to compete in the market and comply with the new digital ring-main unit specifications.

Furthermore, the solution developed is IEC61850, Modbus TCP & RTU compliant.

Digital Primary MV AIS Solution

2024, industrial, switchgear factory, 6th of October, Egypt

Development of a the primary medium-voltage air insulated switchgear smart solution for PIX24 using Saitel DR Remote terminal unit (RTU).

The PIX24 cubicle can be fully controlled & monitored remotely through the circuits installed & software program developed.

The RTU system enables the customer to compete in the market and comply with the new digital switchgear specifications.

Furthermore, the solution developed is IEC61850, Modbus TCP & RTU compliant.

22-02
22-01

VFD Maintenance

April 2022, commercial, hotels & resorts, 6th of October, Egypt

Corrective maintenance of (x4) Variable Frequency Drives after their programs have been affected by severe & consecutive voltage disturbances from the utility supply ABB ACS550, 3x50hp, 1x40hp.

Activities included:

  • Re-programming all drives.
  • Review all drive control circuits.
  • Review all drive interface circuits with pressure sensor.
  • Testing & re-commissioning.
  • Mechanical tightening & cleaning

Pumping System
الأتمتة

January 2022, commercial, hotels & resorts, 6th of October, Egypt

Supply of a softstarter with an automatic control system that controls the starting procedure, number of starts & time delay before allowing a consecutive pump start.

The pump is powered by an asynchronous 40 hp motor.

Activities include:

  1. Engineering & system design.


  1. Documentation, program logic & wiring diagrams.


  1. Installation, commissioning & testing.


  1. Programming of the softstarter & PLC.